
Santhusta 99D: foundations going in, with the hill range behind.
A villa project at Kurubarahalli, on the Doddaballapur side of the Nandi range. Our drone was over the site on 22 August 2026. Everything below is either what our camera found or what a named public source says, with the date we read it.
What is on record
| Project | Santhusta 99D, by Santhusta Infracon Pvt Ltd, as named on a portal. |
|---|---|
| How we list it | General listing. OwnIt1st lists this project and can arrange its documents and a site walk. Ask us how we are paid on it; we answer in writing. |
| Location | Kurubarahalli village, as given in a portal copy of the K-RERA address. |
| Format | Villas. Our desk knows them as row villas; the portal lists four-bedroom villas. |
| Size, as listed on a portal | 99 villas of 2,055 to 3,250 sq ft on 7.37 acres. Not yet read on the sanctioned plan. |
| Price | Ask for the current cost sheet. No price is printed here until a dated sheet is on our desk. |
| K-RERA | A registration number ending …008001 is printed on a portal. Source grade C: we have not read it on the certificate. The row is on the register. |
| Dates, as listed on a portal | The portal copy of the K-RERA record gives 31 July 2028 as the completion date. Read it on the certificate. We do not promise a date. |
| On the ground, 22 August 2026 | A walled site. Internal roads cut in red earth. Rows of foundations going in, with steel stacked beside them. Site sheds. An oval garden laid out at one end. |
Read on 21 November 2026. A figure from a portal is corroboration, not verification: it is replaced by the document the day we read it.
What our camera found
From the air on 22 August 2026: a walled site among vineyards, a long greenhouse and ploughed fields. Its internal roads were cut in red earth, rows of foundations were going in, and steel was stacked beside them.
An oval garden was already laid out at one end. A hill range fills the horizon.
What we have not read yet
The K-RERA certificate. The sanctioned building plan for the villa type on offer. The construction-linked payment schedule. The promoter's legal name as the certificate gives it. A dated cost sheet.
Each one is printed here on the day we read it.
Ask before you visit
- The K-RERA certificate and the completion date printed on it.
- The sanctioned plan for the exact villa, and its land share.
- The payment schedule, and which construction stage the villa has reached on the day you visit.
- A dated cost sheet with every charge on it.
Questions buyers ask us
Is Santhusta 99D K-RERA registered?
A portal prints a registration number ending 008001. We have not read it on the certificate yet, so it carries source grade C here. Ask for the certificate.
When will Santhusta 99D be ready?
The portal copy of the K-RERA record gives 31 July 2028 as the completion date. Read it on the certificate. We do not promise a date.
What does a villa at Santhusta 99D cost?
Ask for the current cost sheet. We print a price only when a dated sheet is on our desk.
Sources
Our photographs are our own and dated. Light, contrast and colour are graded; nothing is added or removed.
The site from the air




Saturday, 7 a.m., at 99D.
We start from the lounge at Karahalli Cross and walk the site with the plan in hand.
Three fields, then WhatsApp opens with your message ready. Tap Send there and the desk replies in the same chat. Ask us how we are paid on this property. We answer in writing before you visit.